PESPacific Environmental Solutions

For development finance

Bankable circular infrastructure for the Pacific

PES structures projects for blended development finance and climate funds, including multilateral banks such as the ADB and the World Bank, the Green Climate Fund, bilateral donors and carbon markets.

Why it fits a green energy portfolio

Mitigation and adaptation in one asset

Emissions fall as landfill and open burning stop, while power and water supply become more resilient.

Results you can verify

An AI-operated plant records what goes in and what comes out, supporting monitoring, reporting and verification.

Phased and de-risked

Projects start with proven components. Fuel cells are added in stages, after validation at the Windsor facility.

Clear accountability

PES is project owner and developer, through a locally owned national company. Bright Sand Canada is technology partner.

1CollectLandfill, MSW, plastics, tyres2Sort and loadRecycling out, feed in3ConvertRotary kiln, tyre pyrolysis4RecoverGas cleaning, carbon, oil5Power and waterFuel cells, solar, desal.6CommunityGrid, water, charging, jobsCircularwaste in,power and water out

The circular system

Where the value is created

Conversion and recovery turn a cost the island pays today into power, water and materials it can use.

  • Convert and recover waste into energy and carbon products.
  • Power and water as measurable outputs for results-based finance.

From concept to operation

  1. Concept note

    Project scope, outcomes and indicative financing approach.

  2. Feasibility and safeguards

    Technical feasibility plus environmental and social safeguards.

  3. Financing structure

    Grants, concessional loans and carbon revenue, blended to fit.

  4. Build

    Phased construction with local hiring and training.

  5. Operate and report

    Ongoing operation with transparent outcome reporting.

Naming these institutions describes the financing PES designs projects for. It does not imply their endorsement or participation.

Scale

Modular, so projects scale in fundable steps

Projects can start with a village or island pilot and expand module by module, which lets financing follow proven results.

  1. 1

    Village

    A single community

    • Village collection points and scheduled pickup
    • Solar with a BESS unit for charging and emergency backup
    • Waste taken to the nearest PES hub
  2. 2

    Remote island

    Off-grid or a small grid

    • A compact hub that runs on the island itself
    • Solar, storage and desalination sized to the island
    • AI-assisted operation for a small local team
  3. 3

    Town

    A provincial or outer-island centre

    • Full hub: rotary kiln, tyre pyrolysis and gas cleaning
    • Landfill takeover and an electric collection fleet
    • Power to the town grid and fresh water
  4. 4

    City

    A capital or main urban centre

    • More processing lines on the same design
    • Fuel-cell tri-generation and grid support
    • City-wide collection and landfill recovery
Start where the need is

Begin with a single village or island and grow from there.

Add modules, not new plants

Capacity grows in steps that match the waste and power the community actually has.

One network

Villages feed island hubs, and island hubs link to town and city systems.

Contact PES

Let’s talk over coffee

Request a project briefing or concept note for your portfolio. Tell us about your island, town or village, and we’ll set up a conversation.

A mug of coffee and a coffee press on a window sill, looking out over green fields and palm trees
Morning coffee in Tonga. Photo: Sean Teo

Sending opens your email app with your message addressed to PES.

PESPacific Environmental Solutions
Registered office
[registered office address]
Facebook
[Facebook page link]
Technology partnerBright Sand Canada, applied research and development